This project will replace the #3 feedwater steam turbine and #3 feed water pump. The project includes the replacement of gate and check valves in both the feedwater piping and steam piping for the #3 pump and turbine system.
This project will replace the #3 feedwater steam turbine and #3 feed water pump. The project includes the replacement of gate and check valves in both the feedwater piping and steam piping for the #3 pump and turbine system.