P809 Facilities Upgrades for FA-18E

Renovation of an existing Hangar 130 to accommodate two F/A18 E/F squadrons to include building upgrades and re-configuration of spaces to house maintenance, training and administrative functions. The renovations will include: fire sprinkler system, fire suppression...

Major Interior/Exterior Repairs, BEQ's HP235 & HP245

The work on both buildings included exterior wall demolition and replacement, construction of new sloped wood-truss roof system and major mechanical and electrical renovation including new geothermal heating and cooling system. Work also included new interior finishes...

Replace GRIT System WWTP, B4376

The work included modifying existing headworks, demolishing the two existing Pista Grit 270s, grit washer, communitor, associated piping, asphalt, force mains, scum holding tank, scum pump station and other miscellaneous items. New work included two new Pista Grit...

Filter Wash Water Reuse, WTP

The work includes a new pump station, force main, and all associated appurtenances, modifications to existing water basin, new polymer feed system, modifications to storm sewer system, new valve and meter vaults, turbidity meter, electrical work, modifications to...

ARRA, P-1357, Child Development Center

The work included new construction of a child development center with the necessary utility infrastructure and incidental related work, including playground equipment.