by wpadmin | Jan 12, 2012
Work on this project involved construction of a single-story armory, consisting of cast-in-place reinforced concrete exterior cavity walls with brick veneer built on a concrete slab and footing foundation, cast-in-place reinforced concrete roof decking, precast...
by wpadmin | Jan 12, 2012
Complete renovation and roof replacement of a 25,000 square foot two-story brick building located aboard MCB Camp Lejeune, North Carolina. This project consists of demolition and replacement of interior walls, ceiling, floor, finishes, plumbing, mechanical, electrical...
by wpadmin | Jan 12, 2012
New construction of a one-story Equipment Maintenance Facility consisting of exterior brick veneer and concrete load-bearing walls, standing-seam metal roof, open web steel joists, a pump house, and a storage building. Construction also includes all electrical,...
by wpadmin | Jan 12, 2012
Completed four month fast-track renovation of two identical two-story buildings located aboard MCB Camp Lejeune in North Carolina. This project consists of asbestos and lead abatement, removal of doors and windows, partitions, stairs, and finishes, new concrete...
by wpadmin | Jan 12, 2012
The work includes installation of roadway/area lighting along the physical fitness trail that is located beside Rooseveldt Blvd. from Slocum Road to Madison Road. All new lighting fixtures are to be LED roadway fixtures. There will be twenty-eight lights mounted on...