Expand Refueler Tanker Truck Parking Area

Reconfiguration and expansion of Tank Farm A located aboard MCAS Cherry Point, N C. This project consists of demolition, reconfiguration and construction to expand refueler tanker truck concrete parking pad and concrete fueling stand. Included are steel parking canopy...

Physical Fitness Center 

Complete demolition of several buildings and connecting wall openings; the construction of a brick block and steel structure on a structural slab and auger piles with standing seam roof, plumbing, mechanical, electrical, and fire protection systems, asbestos and lead...

French Creek Armory

Work on this project involved construction of a single-story armory, consisting of cast-in-place reinforced concrete exterior cavity walls with brick veneer built on a concrete slab and footing foundation, cast-in-place reinforced concrete roof decking, precast...

Renovate Building 12

Complete renovation and roof replacement of a 25,000 square foot two-story brick building located aboard MCB Camp Lejeune, North Carolina. This project consists of demolition and replacement of interior walls, ceiling, floor, finishes, plumbing, mechanical, electrical...

Engineering Equipment Maintenance Shop

New construction of a one-story Equipment Maintenance Facility consisting of exterior brick veneer and concrete load-bearing walls, standing-seam metal roof, open web steel joists, a pump house, and a storage building.  Construction also includes all electrical,...