by wpadmin | Jan 12, 2012
The work included repairs to the T-10 test cell, Building 4495, to include structural, acoustical system, associated support equipment, and incidental related work. Work included: Refurbishing the building structure and accomplishing such items as corrosion removal...
by wpadmin | Jan 12, 2012
The work included interior and exterior repairs to masonry walls, paint all interior and exterior surfaces, install gutters, repair pool and pool deck, new HVAC system, new electrical, and add an accessible family changing room.
by wpadmin | Jan 12, 2012
The work included repairing balcony slabs for thirteen Enlisted Barracks. Repairs consisted of repairing concrete spalling at the face, drip edges and underside of each slab; repairing cracked patches; repairing transverse rebar showing through the underside of...
by wpadmin | Jan 12, 2012
Replace the distance marker signs on all four runways.
by wpadmin | Jan 12, 2012
This project replaced one 400HZ converter, 150KVA, 480V – 208V, 416A, 3 phase unit and provided two secondary 400hz services and an enclosure for Dome Hill Pad Area. Unit to provide for new circuit to East Hill and existing circuits of radar site. New enclosure...