Energy Efficient Street Lighting, Central Core Area

Replaced existing Metal Halide (MH) and Low Pressure Sodium (LPS) street light and area lighting fixtures with new LED fixtures. The new fixtures will be installed on the existing poles using existing arms where applicable and existing wiring. Demoed "cobra...

Repairs to B-1795 for EOD

The work includes a 6,780 SF Building 1795- constructed in 1968- and will be used by three (3) EOD units starting in late FY10 with continued used thereafter. This project will remove asbestos and will repair mechanical, electrical, and plumbing systems, replace roof,...

Various Repairs to B-1787

Various interior and exterior repairs to the building, including demolition, asbestos removal, flooring, masonry, doors & hardware, gutters & downspouts, ceiling tiles, toilet partitions & accessories, painting, and electrical.

Repair Building 155 at Fleet Readiness Center East

The project provided for repairs and replacement of wooden structural components in building 155 due to water damage, termite damage or age cracking. This project also replaced deteriorated wood roof joists, wood roof decking and the existing roofing system. Project...