by wpadmin | Jan 24, 2014
The work includes installation of utility services to support a temporary facility near AS-901 and incidental related work.
by wpadmin | Dec 31, 2013
The work includes replacing leaking underground 2" Geoflex-D pipe encased in 4" Geoduct conduit with new 2" carbon steel pipe encased in 4" FRP pipe. The existing piping supplies fuel from AST 1256 and 1257 to the fuel dispensers in Building 3963....
by wpadmin | Dec 31, 2013
The work includes re-lamp existing sanctuary luminaires to lower wattage. Install 32 led can luminaires, replace existing lighting dimming system with new & any incidental work.
by wpadmin | Dec 20, 2013
The work includes the demolition of various equipment, installation of an electric fire pump controller, 480V panelboard, step down transformer, 208Y/120V panelboard and incidental related work.