by wpadmin | Feb 25, 2014
The work includes a new pre-engineered metal building with lighting, heat, ventilation, site work, and incidental related work.
by wpadmin | Feb 25, 2014
Install intrusion alarm switches on twenty-one (21) water-well house doors and hatches, and connect them to the existing monitoring and control system.
by wpadmin | Jan 24, 2014
The work includes installation of utility services to support a temporary facility near AS-901 and incidental related work.
by wpadmin | Dec 31, 2013
The work includes replacing leaking underground 2" Geoflex-D pipe encased in 4" Geoduct conduit with new 2" carbon steel pipe encased in 4" FRP pipe. The existing piping supplies fuel from AST 1256 and 1257 to the fuel dispensers in Building 3963....