Remove spot cooler from Comm Room 8, patch wall penetrations. Install 2 ductless mini-split air conditioning systems. Install a hard-wired thermostat with each system. Provide an equipment pad suitable for the selected unit weight. Install 2 dedicated single phase, 30...
by wpadmin | May 22, 2014
Demolish the existing 400 HZ frequency converter in the equipment shed behind room 63 in Building 244. Install a new feeder between the 400 HZ bus duct sections in rooms 24 and 44A.
by wpadmin | May 19, 2014
The work includes demolition of existing 8' x 10' wood and metal structure that is mounted on existing radar tower. Additional work includes installation of new Pre-engineered Container and minimal structural supports on existing tower. Electrical and...
by wpadmin | Apr 21, 2014
The work includes replacement of HVAC equipment, ductwork, associated controls and incidental related work.