by wpadmin | Feb 19, 2015
The work includes replacing electrical panels and subpanels, replacing the fire alarm system, installing a fire suppression sprinkler system, replacing split system heat pumps, repainting interior doors and frames, painting exterior steel surfaces, replacing floor...
by wpadmin | Sep 11, 2014
The work includes renovation of existing Building AS-840 which includes; new hangar doors, aluminum storefront entrance systems replacement, translucent panels, renovation of men's head, and creation of a women's head, several new doors and hardware, new...
by wpadmin | Aug 26, 2014
Install DX9100 controller from the N2 line of Johnson Controls in multiple locations; and integrate the Johnson Controls DDC system in the new addition at Tarawa Terrace Elementary, with the ADX server.