F-35 Infrastructure, B-4224 FRC-E

The work includes installation of telecommunications network and infrastructure, testing and balancing (TAB) of existing HVAC supply diffusers and return registers, and incidental related work.

Major Interior/Exterior Repairs, Bldg 217

The work includes demolition of interior finishes, plumbing, mechanical and electrical systems; new interior layout and finishes, new plumbing, mechanical, electrical systems, new sprinkler system and new fire alarm system and incidental related work.

Renovate PT-5

The work includes renovating the existing Building PT5. Work to include minor site excavation and new planting. Interior demolition includes concrete slab, door frames and doors, interior wall partitions, electrical panels, wiring, and lighting, plumbing fixtures and...

Replace Obsolete PLC B-4380

The intent of this project is to replace the existing SIEMENS TI505 PLC & remote I/O racks in B4380 and B1005 at the Industrial Waste Treatment Plant (IWTP) with an AB ControlLogix PLC system in B4380 with remote racks in B4380 and B1005.