by wpadmin | Jan 12, 2012
The work included repairing balcony slabs for thirteen Enlisted Barracks. Repairs consisted of repairing concrete spalling at the face, drip edges and underside of each slab; repairing cracked patches; repairing transverse rebar showing through the underside of...
by wpadmin | Jan 12, 2012
The work included demolition of interior finishes, plumbing, mechanical and electrical systems. New interior layout and finishes, new plumbing, mechanical, electrical systems, new sprinkler system and new fire alarm system and incidental related work.
by wpadmin | Jan 12, 2012
The work included construction of a steel-framed platform with a metal bar grating walking surface to an existing mechanical unit in Hanger 131; construction of a steel ladder for access to an existing steel framed platform in Hanger 250; & demolition of an...
by wpadmin | Nov 15, 2011
The work included modifying existing headworks, demolishing the two existing Pista Grit 270s, grit washer, communitor, associated piping, asphalt, force mains, scum holding tank, scum pump station and other miscellaneous items. New work included two new Pista Grit...
by wpadmin | Nov 15, 2011
The work included new construction of a child development center with the necessary utility infrastructure and incidental related work, including playground equipment.