by wpadmin | Jan 12, 2012
New gymnasium facility, located in Pikeville, North Carolina, built for the Wayne County Board of Education. The building is approximately 25,000 square feet consisting of both structural steel and load-bearing masonry.
by wpadmin | Jan 12, 2012
The work included repairs to the T-10 test cell, Building 4495, to include structural, acoustical system, associated support equipment, and incidental related work. Work included: Refurbishing the building structure and accomplishing such items as corrosion removal...
by wpadmin | Jan 12, 2012
The work included repairing balcony slabs for thirteen Enlisted Barracks. Repairs consisted of repairing concrete spalling at the face, drip edges and underside of each slab; repairing cracked patches; repairing transverse rebar showing through the underside of...
by wpadmin | Jan 12, 2012
The work included demolition of interior finishes, plumbing, mechanical and electrical systems. New interior layout and finishes, new plumbing, mechanical, electrical systems, new sprinkler system and new fire alarm system and incidental related work.
by wpadmin | Jan 12, 2012
The work included construction of a steel-framed platform with a metal bar grating walking surface to an existing mechanical unit in Hanger 131; construction of a steel ladder for access to an existing steel framed platform in Hanger 250; & demolition of an...