Repair Bathrooms Building 93

Repaired existing shower, added a shower install HVAC and exhaust systems, toilets, urinals reinstall partitions, replaced fixtures install floor tile in the bathrooms and replaced the tile floors in the break rooms.

Revised Reclaimed Water WWTP, Bldg 4376

The purpose of this project is to provide reclaimed (non-potable) water, supplied by final effluent pumps at the wastewater treatment plant, to supply water for the wastewater treatment plant headworks in an effort to reduce the usage of potable water. The following...