Replace Leaking and Obsolete Fuel Line Bldg 3963

The work includes replacing leaking underground 2" Geoflex-D pipe encased in 4" Geoduct conduit with new 2" carbon steel pipe encased in 4" FRP pipe. The existing piping supplies fuel from AST 1256 and 1257 to the fuel dispensers in Building 3963....

Construct High Voltage Storage Yard

The intent of this project is to create a 105' x 140' area secured by 7' chain link fence and topped with 45 degree outriggers with three strands of barbed wire. There will be two outward swinging 10' vehicle gates. All exterior fences will be...