by wpadmin | Feb 19, 2015
The work includes replacing electrical panels and subpanels, replacing the fire alarm system, installing a fire suppression sprinkler system, replacing split system heat pumps, repainting interior doors and frames, painting exterior steel surfaces, replacing floor...
by wpadmin | Sep 11, 2014
The work includes renovation of existing Building AS-840 which includes; new hangar doors, aluminum storefront entrance systems replacement, translucent panels, renovation of men's head, and creation of a women's head, several new doors and hardware, new...
by wpadmin | Jun 18, 2014
The work includes renovating the existing Building PT5. Work to include minor site excavation and new planting. Interior demolition includes concrete slab, door frames and doors, interior wall partitions, electrical panels, wiring, and lighting, plumbing fixtures and...
by wpadmin | Jun 12, 2014
The contract provides improvements and repairs to existing BEQ at MCAS, Cherry Point, N.C. The work includes but is not limited to replacing windows, doors, exterior concrete balconies, exterior guardrails, and providing new interior finishes; minor structural...
by wpadmin | Apr 11, 2014
The project provides for an addition to Building 9060 at BT-11. The work includes but is not limited to demolition, rough carpentry, metal wall and roof panels, electrical (power and lighting), earthwork, and incidental related work.