by wpadmin | Sep 11, 2014
The work includes renovation of existing Building AS-840 which includes; new hangar doors, aluminum storefront entrance systems replacement, translucent panels, renovation of men's head, and creation of a women's head, several new doors and hardware, new...
by wpadmin | Jun 18, 2014
The work includes renovating the existing Building PT5. Work to include minor site excavation and new planting. Interior demolition includes concrete slab, door frames and doors, interior wall partitions, electrical panels, wiring, and lighting, plumbing fixtures and...
by wpadmin | Jun 12, 2014
The contract provides improvements and repairs to existing BEQ at MCAS, Cherry Point, N.C. The work includes but is not limited to replacing windows, doors, exterior concrete balconies, exterior guardrails, and providing new interior finishes; minor structural...
by wpadmin | Apr 11, 2014
The project provides for an addition to Building 9060 at BT-11. The work includes but is not limited to demolition, rough carpentry, metal wall and roof panels, electrical (power and lighting), earthwork, and incidental related work.
by wpadmin | Feb 25, 2014
The work includes a new pre-engineered metal building with lighting, heat, ventilation, site work, and incidental related work.