Pave POV Parking Lot, Bldg 1522

The work includes removing two inches of existing gravel and adding two inches of asphalt to the lot to restore lot to existing grades and drainage patterns (current parking lot is gravel with a concrete curbing around the perimeter). Parking stalls will also be...

Construct Restrooms at Lanham Field

Lanham Field is a new 1444 square foot masonry building with a metal roof. The building will be a concrete slab with an exterior of ground face CMU block wainscot and brick veneer. The interior will be ground face block walls, terrazzo floors with mechanical and...

Revised Reclaimed Water WWTP, Bldg 4376

The purpose of this project is to provide reclaimed (non-potable) water, supplied by final effluent pumps at the wastewater treatment plant, to supply water for the wastewater treatment plant headworks in an effort to reduce the usage of potable water. The following...