by wpadmin | Feb 19, 2015
The work includes replacing electrical panels and subpanels, replacing the fire alarm system, installing a fire suppression sprinkler system, replacing split system heat pumps, repainting interior doors and frames, painting exterior steel surfaces, replacing floor...
by wpadmin | Feb 25, 2014
The work includes a new pre-engineered metal building with lighting, heat, ventilation, site work, and incidental related work.
by wpadmin | Jun 26, 2012
The purpose of this project is to provide reclaimed (non-potable) water, supplied by final effluent pumps at the wastewater treatment plant, to supply water for the wastewater treatment plant headworks in an effort to reduce the usage of potable water. The following...