Replace Obsolete PLC B-4380

The intent of this project is to replace the existing SIEMENS TI505 PLC & remote I/O racks in B4380 and B1005 at the Industrial Waste Treatment Plant (IWTP) with an AB ControlLogix PLC system in B4380 with remote racks in B4380 and B1005.

Revised Reclaimed Water WWTP, Bldg 4376

The purpose of this project is to provide reclaimed (non-potable) water, supplied by final effluent pumps at the wastewater treatment plant, to supply water for the wastewater treatment plant headworks in an effort to reduce the usage of potable water. The following...

General Construction MACC Guide Specifications

We are currently participating in the General Construction Multiple Award Construction Contract (MACC) program for Camp Lejeune and Cherry Point. Before downloading any of these projects to bid, PLEASE READ the general specifications for these programs. All projects...