Base Pass Requirements

The MCB Camp Lejeune and MCAS Cherry Point are now issuing DBIDs Badges for Base Pass. They will no longer accept RapidGate after December 31, 2018. You must contact Ellen Hartness at Blue Rock Structures, Inc. for letter and forms (the letter is only good for 30...

Repair and Improvements to B-244, CNATT

The work includes replacing electrical panels and subpanels, replacing the fire alarm system, installing a fire suppression sprinkler system, replacing split system heat pumps, repainting interior doors and frames, painting exterior steel surfaces, replacing floor...

Replace Obsolete PLC B-4380

The intent of this project is to replace the existing SIEMENS TI505 PLC & remote I/O racks in B4380 and B1005 at the Industrial Waste Treatment Plant (IWTP) with an AB ControlLogix PLC system in B4380 with remote racks in B4380 and B1005.