by wpadmin | Feb 27, 2014
The work includes demolishing the existing interior partition walls separating room 108A from room 108 in Building 3898 and removing existing double door from room 108A to the corridor, filling in the door opening. Install new full height interior modular wall...
by wpadmin | May 14, 2013
The work includes installation of interior fence barriers, relocation of furniture and equipment, wall construction, minor HVAC and electrical work and incidental related work.
by wpadmin | Aug 23, 2012
Lanham Field is a new 1444 square foot masonry building with a metal roof. The building will be a concrete slab with an exterior of ground face CMU block wainscot and brick veneer. The interior will be ground face block walls, terrazzo floors with mechanical and...