by wpadmin | Feb 19, 2015
The work includes replacing electrical panels and subpanels, replacing the fire alarm system, installing a fire suppression sprinkler system, replacing split system heat pumps, repainting interior doors and frames, painting exterior steel surfaces, replacing floor...
by wpadmin | Sep 11, 2014
The work includes renovation of existing Building AS-840 which includes; new hangar doors, aluminum storefront entrance systems replacement, translucent panels, renovation of men's head, and creation of a women's head, several new doors and hardware, new...
by wpadmin | Jul 11, 2014
The work includes the demolition of interior finishes and new interior finishes for the surgical suite (OR's) that includes plumbing, mechanical, and electrical system modifications and upgrades to security system.
by wpadmin | Jun 24, 2014
The work includes demolition of interior finishes, plumbing, mechanical and electrical systems; new interior layout and finishes, new plumbing, mechanical, electrical systems, new sprinkler system and new fire alarm system and incidental related work.
by wpadmin | Jun 18, 2014
The work includes renovating the existing Building PT5. Work to include minor site excavation and new planting. Interior demolition includes concrete slab, door frames and doors, interior wall partitions, electrical panels, wiring, and lighting, plumbing fixtures and...