Repair Bathrooms Building 93

Repaired existing shower, added a shower install HVAC and exhaust systems, toilets, urinals reinstall partitions, replaced fixtures install floor tile in the bathrooms and replaced the tile floors in the break rooms.

Repairs to B-1795 for EOD

The work includes a 6,780 SF Building 1795- constructed in 1968- and will be used by three (3) EOD units starting in late FY10 with continued used thereafter. This project will remove asbestos and will repair mechanical, electrical, and plumbing systems, replace roof,...

Repair Building 155 at Fleet Readiness Center East

The project provided for repairs and replacement of wooden structural components in building 155 due to water damage, termite damage or age cracking. This project also replaced deteriorated wood roof joists, wood roof decking and the existing roofing system. Project...

General Construction MACC Guide Specifications

We are currently participating in the General Construction Multiple Award Construction Contract (MACC) program for Camp Lejeune and Cherry Point. Before downloading any of these projects to bid, PLEASE READ the general specifications for these programs. All projects...

General Construction MACC Guide Specifications

We are currently participating in the General Construction Multiple Award Construction Contract (MACC) program for Camp Lejeune and Cherry Point. Before downloading any of these projects to bid, PLEASE READ the general specifications for these programs. All projects...