Revised Reclaimed Water WWTP, Bldg 4376

The purpose of this project is to provide reclaimed (non-potable) water, supplied by final effluent pumps at the wastewater treatment plant, to supply water for the wastewater treatment plant headworks in an effort to reduce the usage of potable water. The following...

General Construction MACC Guide Specifications

We are currently participating in the General Construction Multiple Award Construction Contract (MACC) program for Camp Lejeune and Cherry Point. Before downloading any of these projects to bid, PLEASE READ the general specifications for these programs. All projects...

General Construction MACC Guide Specifications

We are currently participating in the General Construction Multiple Award Construction Contract (MACC) program for Camp Lejeune and Cherry Point. Before downloading any of these projects to bid, PLEASE READ the general specifications for these programs. All projects...

Repair BEQ Walkway B-4310

The work included Demolishing and replacing an existing cantilevered beam supporting the 2nd floor walkway, and incidental related work. The requirements included hiring a structural engineer to evaluate and confirm the project scope, and provide a sealed brief...

ARRA, P-1357, Child Development Center

The work included new construction of a child development center with the necessary utility infrastructure and incidental related work, including playground equipment.