by wpadmin | Jun 26, 2012
The purpose of this project is to provide reclaimed (non-potable) water, supplied by final effluent pumps at the wastewater treatment plant, to supply water for the wastewater treatment plant headworks in an effort to reduce the usage of potable water. The following...
by wpadmin | Jan 30, 2012
We are currently participating in the General Construction Multiple Award Construction Contract (MACC) program for Camp Lejeune and Cherry Point. Before downloading any of these projects to bid, PLEASE READ the general specifications for these programs. All projects...
by wpadmin | Jan 16, 2012
The work included Demolishing and replacing an existing cantilevered beam supporting the 2nd floor walkway, and incidental related work. The requirements included hiring a structural engineer to evaluate and confirm the project scope, and provide a sealed brief...
by wpadmin | Nov 15, 2011
The work included new construction of a child development center with the necessary utility infrastructure and incidental related work, including playground equipment.