by wpadmin | Jan 12, 2012
Complete demolition of several buildings and connecting wall openings; the construction of a brick block and steel structure on a structural slab and auger piles with standing seam roof, plumbing, mechanical, electrical, and fire protection systems, asbestos and lead...
by wpadmin | Jan 12, 2012
Work on this project involved construction of a single-story armory, consisting of cast-in-place reinforced concrete exterior cavity walls with brick veneer built on a concrete slab and footing foundation, cast-in-place reinforced concrete roof decking, precast...
by wpadmin | Jan 12, 2012
Complete renovation and roof replacement of a 25,000 square foot two-story brick building located aboard MCB Camp Lejeune, North Carolina. This project consists of demolition and replacement of interior walls, ceiling, floor, finishes, plumbing, mechanical, electrical...
by wpadmin | Jan 12, 2012
New construction of a one-story Equipment Maintenance Facility consisting of exterior brick veneer and concrete load-bearing walls, standing-seam metal roof, open web steel joists, a pump house, and a storage building. Construction also includes all electrical,...
by wpadmin | Jan 12, 2012
Completed four month fast-track renovation of two identical two-story buildings located aboard MCB Camp Lejeune in North Carolina. This project consists of asbestos and lead abatement, removal of doors and windows, partitions, stairs, and finishes, new concrete...