Repair Bathrooms Building 93

Repaired existing shower, added a shower install HVAC and exhaust systems, toilets, urinals reinstall partitions, replaced fixtures install floor tile in the bathrooms and replaced the tile floors in the break rooms.

Facility Energy Repairs B-3769

The work includes replacement of roof, HVAC lights, and interior and exterior finishes repair and replacement, and incidental related work.

Energy Efficient Street Lights, Housing Area

Replaced existing Metal Halide (MH) and Low Pressure Sodium (LPS) street light and area lighting fixtures with new LED fixtures. The new fixtures will be installed on the existing poles using existing arms where applicable and existing wiring. Demoed "cobra...

Revised Reclaimed Water WWTP, Bldg 4376

The purpose of this project is to provide reclaimed (non-potable) water, supplied by final effluent pumps at the wastewater treatment plant, to supply water for the wastewater treatment plant headworks in an effort to reduce the usage of potable water. The following...

Energy Efficient Street Lighting, Central Core Area

Replaced existing Metal Halide (MH) and Low Pressure Sodium (LPS) street light and area lighting fixtures with new LED fixtures. The new fixtures will be installed on the existing poles using existing arms where applicable and existing wiring. Demoed "cobra...