by wpadmin | Jun 12, 2014
The contract provides improvements and repairs to existing BEQ at MCAS, Cherry Point, N.C. The work includes but is not limited to replacing windows, doors, exterior concrete balconies, exterior guardrails, and providing new interior finishes; minor structural...
by wpadmin | May 27, 2014
Remove spot cooler from Comm Room 8, patch wall penetrations. Install 2 ductless mini-split air conditioning systems. Install a hard-wired thermostat with each system. Provide an equipment pad suitable for the selected unit weight. Install 2 dedicated single phase, 30...
by wpadmin | May 22, 2014
Demolish the existing 400 HZ frequency converter in the equipment shed behind room 63 in Building 244. Install a new feeder between the 400 HZ bus duct sections in rooms 24 and 44A.
by wpadmin | May 19, 2014
The work includes demolition of existing 8' x 10' wood and metal structure that is mounted on existing radar tower. Additional work includes installation of new Pre-engineered Container and minimal structural supports on existing tower. Electrical and...
by wpadmin | Apr 21, 2014
The work includes replacement of HVAC equipment, ductwork, associated controls and incidental related work.