Major Interior/Exterior Repairs, Bldg 217

The work includes demolition of interior finishes, plumbing, mechanical and electrical systems; new interior layout and finishes, new plumbing, mechanical, electrical systems, new sprinkler system and new fire alarm system and incidental related work.

Renovate PT-5

The work includes renovating the existing Building PT5. Work to include minor site excavation and new planting. Interior demolition includes concrete slab, door frames and doors, interior wall partitions, electrical panels, wiring, and lighting, plumbing fixtures and...

Repairs & Improvements to BEQ 4168

The contract provides improvements and repairs to existing BEQ at MCAS, Cherry Point, N.C. The work includes but is not limited to replacing windows, doors, exterior concrete balconies, exterior guardrails, and providing new interior finishes; minor structural...

Upgrades to Building 3898

The work includes demolishing the existing interior partition walls separating room 108A from room 108 in Building 3898 and removing existing double door from room 108A to the corridor, filling in the door opening. Install new full height interior modular wall...