by wpadmin | Feb 27, 2014
The work includes demolishing the existing interior partition walls separating room 108A from room 108 in Building 3898 and removing existing double door from room 108A to the corridor, filling in the door opening. Install new full height interior modular wall...
by wpadmin | Feb 25, 2014
The work includes a new pre-engineered metal building with lighting, heat, ventilation, site work, and incidental related work.
by wpadmin | Jan 24, 2014
The work includes installation of utility services to support a temporary facility near AS-901 and incidental related work.
by wpadmin | Dec 31, 2013
The work includes replacing leaking underground 2" Geoflex-D pipe encased in 4" Geoduct conduit with new 2" carbon steel pipe encased in 4" FRP pipe. The existing piping supplies fuel from AST 1256 and 1257 to the fuel dispensers in Building 3963....