Upgrades to Building 3898

The work includes demolishing the existing interior partition walls separating room 108A from room 108 in Building 3898 and removing existing double door from room 108A to the corridor, filling in the door opening. Install new full height interior modular wall...

Replace Leaking and Obsolete Fuel Line Bldg 3963

The work includes replacing leaking underground 2" Geoflex-D pipe encased in 4" Geoduct conduit with new 2" carbon steel pipe encased in 4" FRP pipe. The existing piping supplies fuel from AST 1256 and 1257 to the fuel dispensers in Building 3963....