by wpadmin | Oct 17, 2017
THE CONTRACTOR SHALL PROVIDE AND INSTALL A 6,250SF PRE-ENGINEERED METAL BUILDING 50’0”X125’0”X10’0” EAVE PER THE DRAWINGS/PLAN IN ATTACHMENT J. JOB SHALL INCLUDE BUT NOT LIMITED TO SITE PREP, FOUNDATION, ELECTRICAL AND MECHANICAL,...
by wpadmin | Aug 18, 2017
The work includes repairs and upgrades to the existing headworks facility at the existing Wastewater Treatment Plant and incidental related work.
by wpadmin | Apr 28, 2017
by wpadmin | Apr 26, 2017
The work includes repairs to the wastewater drip irrigation system by converting it from a spray irrigation system to an above ground infiltration system and incidental related work.