Steel Access Platforms-Buildings 131, 250, & 152

The work included construction of a steel-framed platform with a metal bar grating walking surface to an existing mechanical unit in Hanger 131; construction of a steel ladder for access to an existing steel framed platform in Hanger 250; & demolition of an...

Skeet Range Addition

The work includes the cleaning and grubbing of approximately 5 acres of dense woods to create a 3 firing lane addition to the Relocated Skeet Range. This work is intended to expand the Skeet Range on the east side of the range, provide a permanent office/retail...

Replace GRIT System WWTP, B4376

The work included modifying existing headworks, demolishing the two existing Pista Grit 270s, grit washer, communitor, associated piping, asphalt, force mains, scum holding tank, scum pump station and other miscellaneous items. New work included two new Pista Grit...

Filter Wash Water Reuse, WTP

The work includes a new pump station, force main, and all associated appurtenances, modifications to existing water basin, new polymer feed system, modifications to storm sewer system, new valve and meter vaults, turbidity meter, electrical work, modifications to...

ARRA, P-1357, Child Development Center