Exceeding Expectations for over a Decade
Portfolio
Dental Room Modifications, Building 15
Completion Date: Jul 8, 2014 |
Bid Type: Hubzone MACC |
Project Duration: 60 Days |
Status: Completed |
Contract NumberN40085-11-D-8023-0024
Project ManagerBlue Rock Structures, Inc., Justin Jones, (910)743-0505, jjones@bluerockstr.com
OwnerNAVFAC Midlant
LocationMCB, Camp Lejeune, NC
Project NotesPrice Proposals shall be valid 120 days.
DescriptionInstall lateral lines from the main vacuum and air lines running above the first floor finished ceilings to an area beneath room. Install hot and cold water lines and drain to accommodate new sink. Lines and drain to be of size equal to those for sinks in adjacent DTRs. Install base cabinets and sink of a configuration approximate to the adjacent DTRs. The new cabinets shall be upgraded to solid chemical resistant countertops and end piece. Make all connections to complete fully functioning sink.