Make Various Repairs and Paint, Buildings 4210 (APOE EMBARK)

Completion Date: May 6, 2014

Bid Type: General Construction MACC

Project Duration: 180 Days

Status: Completed


Contract NumberN40085-10-D-0260-0026

Project ManagerBlue Rock Structures, Inc., Justin Jones, (910)743-0505, jjones@bluerockstr.com

OwnerNAVFAC MID ATLANTIC, ENS Cory Henry, 252 466 4728

LocationMCAS, Cherry Point, NC

DescriptionReplace the rooftop package HVAC with and updated energy efficient system. Replace exterior doors. Replace windows with metal white metal white double sash, explosion proof windows. Replace sub panels with new Square-D panels. Replace all plumbing fixtures throughout the facility. Replace Floor coverings; replace the existing carpet, VFT , floor and wall tile, and cove base. Removal of all the flaking
and peeling paint, on all interior walls, ceiling, and both sides of the doors and floor. Paint with interior/exterior latex all previously painted interior surfaces. Remove all old caulking from expansion joints and re-caulk. Prep and paint all Exterior doors/frames.