Exceeding Expectations for over a Decade

Ongoing Projects

Repair Wastewater System, BT-11

Completion Date: Oct 7, 2018

Bid Type: General Construction MACC

Project Duration: 380 Days

Status: Awarded


Contract NumberN4008516D6300/N4008517F5011

Project ManagerBlue Rock Structures, Inc., Chris Lawson 910-743-0505, clawson@bluerockstr.com

OwnerNAVFAC Mid Atlantic, LT. Hugo Lerma 252-466-4130, hugo.lerma@navy.mil

LocationMCAS, Cherry Point, NC

Project NotesPrice Proposals shall be valid 120 days.

DescriptionThe work includes repairs to the wastewater drip irrigation system by
converting it from a spray irrigation system to an above ground
infiltration system and incidental related work.


Solicitations

Document Title

RFP

RFP   (52.99 KB)    

RFP

Bid Form

Bid Form   (13.78 KB)    

Bid Form



Specifications

Document Title

Specs

Specs   (7.19 MB)    

Specs



Drawings

Document Title

Drawings

Drawings   (3.62 MB)    

Drawings



Amendments

Document Title

Amendment 0001

Amendment 0001   (121.97 KB)    

Amendment 0001

Amendment 0002

Amendment 0002   (120.74 KB)    

Amendment 0002

Amendment 0002 Drawing E-02 revised

Amendment 0002 Drawing E-02 revised   (434.81 KB)    

Amendment 0002 Drawing E-02 revised

Amendment 0003

Amendment 0003   (33.89 KB)    

Amendment 0003

Amendment 0004

Amendment 0004   (33.9 KB)    

Amendment 0004

Amendment 0005

Amendment 0005   (504.57 KB)    

Amendment 0005




 Loading